Control CabinReporting according to the Machine parameters

  • Distribution of aggregate (in hot bins)
  • Distribution of complementary material (Filler, cement)
  • Amount of bitumen
  • Temperature Distribution
    • Temperature of aggregate
    • Temperature of bitumen
    • Temperature of chimney
    • Temperature of fuel-oil
  •   Failures & Alarm distribution
  •   Mixing time period
  •   Production capacity (Real capacity) distribution
  •   Cold aggregate feeding distribution (required capacity)
  •   Production cost distribution
    • Fuel consumption
    • Electricity cost
    • Amount of bitumen

GLOBAL INSTALLATION